Complicated Brownfield Expansion for an Ontario Gold Process Plant
Halyard provided engineering, design, and procurement services for Alamos Gold’s Island Gold Mine expansion. Our scope covered the process plant and associated surface infrastructure to accommodate a throughput increase from 1,200 tpd to 2,400 tpd.
This was an intricate brownfield project which was meant to occur whilst the plant was running. As far as possible, existing equipment was incorporated into Halyard’s design.