Skip to content
Aappaluttoq Mine Dense Media Separation (DMS) Plant

DMS Plant For A Remote Ruby Mine in Greenland.

Design, supply and installation for a modular DMS Plant

Halyard designed, supplied, and installed a DMS pre-concentration plant at this remote ruby processing operation in Greenland. It was critical that the design of the circuits be modular and pre-assembled as much as possible prior to being shipped to site.

To reduce capital expenditure and save time on the project’s schedule, Halyard sourced and refurbished a previously-owned modular DMS plant.  Although the plant was previously operated, after the mechanical equipment was refurbished and electrical components were replaced, the plant was in near new-condition and the project was a success.

This was the first of several exciting Greenland projects on which the Halyard team has worked.

Project Profile

Project Type:

Greenfield

Location:

Greenland

Commodity:

Rubies

Service Scope:

EPC