New Afton Tower Setup

Relocation Of A Sample Tower To A Gold Mine In British Columbia.

Refurbish and upgrade the plant

The client’s mine in British Columbia required a metallurgical accounting method for measuring head grades from tolled ore received at the site from other entities. For this project, the client purchased a used sample tower that Halyard built and supplied to another mine in 2016.

Halyard provided a turnkey solution to refurbish and upgrade the plant and supply additional materials handling equipment. This plant was then integrated into the existing circuit from a process and control perspective.

Thereafter Halyard commissioned the plant and provided on site training to the operators.

Project Profile

Project Type:

Brownfield

Location:

British Columbia, Canada

Commodity:

Gold

Service Scope:

Fixed Price Design & Supply, Commissioning