Relocation Of A Sample Tower To A Gold Mine In British Columbia.
Refurbish and upgrade the plant
The client’s mine in British Columbia required a metallurgical accounting method for measuring head grades from tolled ore received at the site from other entities. For this project, the client purchased a used sample tower that Halyard built and supplied to another mine in 2016.
Halyard provided a turnkey solution to refurbish and upgrade the plant and supply additional materials handling equipment. This plant was then integrated into the existing circuit from a process and control perspective.
Thereafter Halyard commissioned the plant and provided on site training to the operators.